- Construction of the Nemnovskaya hydro-electric power station on the Neman river installed power – 20 MW
- Construction of the Orsha hydro-electric power station on the Dnepr river installed power – 5,65 MW
- Construction of the Mogilev hydro-electric power station on the Dnepr river installed power – 5,1 MW
- Construction of the Shklov hydro-electric power station on the Dnepr river installed power – 4,9 MW
- Construction of the Rechitsa hydro-electric power station on the Dnepr river installed power – 4,6 MW
- Construction of CCGT-35 Unit including GTP-25, waste heat recovery boiler and gas turbine unit for Gomel CHP-1
- Reconstruction Minsk CHP-2 (second stage), the installation of turbines of 15 MW
- Reconstruction of Minsk CHP-3 with the replacement of retired capacities of 14 MP line
- Reconstruction of the Bobruisk CHP-2 including GTP and waste heat recovery boiler installation
- Reconstruction of the Mogilev CHP No.1, 1-st construction phase. Installation of GTP-25
- The list of proposals on creation of innovative exportoriented and port-substituting products SPA “Belenergo”